Chemelex AI Data Center Intelligence
Overview
95 U.S. facilities
7 enriched samples

U.S. Data Center Asset Protection & Liquid-Cooling Opportunity Overview

Facility, cooling, decision-window and commercial engagement intelligence for Chemelex

95 Facilities · 7 Enriched Technical Samples
Facilities Tracked
95
U.S. facility records in the dataset
Under Construction
49
51.6%
Hyperscale Exposure
47
49.5%
Texas Concentration
32
33.7%

Chemelex Opportunity Snapshot

Based on 7 enriched technical facilities
Next-12-Month Opportunity
6/7
85.7%
High Engagement Priority
5/7
71.4%
Liquid-Cooling Base Case ≥75%
5/7
71.4%
Modeled CDU Connectors
219,180
109,590 modeled hoses

$100.99B facility capex context · 8.33 GW disclosed IT load across 6/7 enriched facilities

Facility capex is project-scale context, not Chemelex TAM. Modeled CDU connection counts are liquid-loop exposure indicators, not Chemelex product-unit demand.

Pursuit Strategy

Derived from the leading qualifier of the source Engagement Priority text · enriched sample
Pursue Now
71.4%
5

Active cooling, specification or expansion pursuit

Specify / Influence
14.3%
1

Influence next-phase cooling and leak-detection architecture

Monitor / Trigger
14.3%
1

Wait for power, tenant or fit-out trigger

Portfolio Development Lifecycle

All 95 facilities
20
21.1%
49
51.6%
24
25.3%
Announced / Planned
Under Construction
Operational
Mixed / Multi-phase — 1 · 1.1%Delayed — 1 · 1.1%
Facilities by State

All 29 individually named states represented in the portfolio

Additional geography records: Multiple 2 · Multi-state 1 · Undisclosed 1

Owner Type

Normalized owner classification, shown with short chart labels

Why These Opportunities Matter for Chemelex
Strategic interpretation of the enriched technical sample — not a repeat of the source fields
FacilityOpportunity ClassWhy NowChemelex Entry PointRoute to OpportunityRecommended Action
Vantage Frontier
Vantage Data Centers — Frontier AI Mega-Campus
Immediate High-Fit / Pursue Now
A 1.4 GW greenfield AI campus with liquid cooling, very high rack-density capability and 2026–2027 CDU deployment creates an active specification opportunity across multiple buildings.
Facility Loop
Rack / CDU / OEM
Vantage engineering + Kiewit + cooling/OEM stakeholdersUse a dual-path specification approach: pursue facility-level cooling/leak-detection design while positioning OEM-integrated sensing around CDU, manifold, hose and rack liquid loops. Prioritize later buildings where specification influence remains greater.
Applied Digital Polaris Forge 2
Applied Digital — Polaris Forge 2 AI Campus
Immediate High-Fit / Platform Qualification
Direct-to-chip architecture and a 90% base-case liquid-cooling assumption create a strong technical fit, but initial first-wave packages are comparatively late-stage while Building 2 and broader expansion remain more actionable.
Rack / CDU / OEM
Facility Heat Rejection
Applied Digital platform engineering/procurement + cooling/electrical OEM partnersPrioritize platform/OEM qualification and Building 2/future expansion rather than relying primarily on late-stage site-GC substitution. Position repeatable leak-detection integration that can fit Applied Digital's standardized AI Factory delivery model.
DataBank Red Oak
DataBank — Red Oak Campus (DFW9–DFW12 Phase 1)
Phase / Specification Opportunity
The campus is liquid-ready at 100 kW+ cabinet density, but DFW9–DFW11 are more advanced while DFW12 and Phase 2 provide a stronger forward specification window.
Facility Loop
Tenant Liquid Loop
DataBank engineering/procurement + Rogers-O'Brien/package owners + tenant cooling stakeholdersSeparate the pursuit by phase: target DFW9–DFW11 for commissioning/fit-out leak detection while prioritizing DFW12 and Phase 2 for earlier specification influence.
Microsoft Fairwater
Microsoft Fairwater AI Datacenter Campus — Mount Pleasant
Phase / Expansion Influence
Phase 1 is operational, but Phase 2 construction is active and Phase 3 remains a future opportunity. The campus combines an extensive closed-loop chilled-water system with direct-to-server liquid cooling.
Facility Loop
Rack / CDU / OEM
Microsoft cooling/data-center engineering + Walsh project engineering/procurementDo not target Fairwater 1 core construction. Focus commercial effort on Phase 2/3 cooling infrastructure, mechanical-piping monitoring and rack/CDU liquid-cooling specification.
Digital Realty SJC37
Digital Realty — Silicon Valley SJC37
Trigger-Gated / Monitor
The base building is complete, but utility certainty and tenant fit-out remain the key commercial gates. Current liquid-cooling relevance is substantially lower than the other enriched opportunities.
Facility Loop Now
Rack / CDU Conditional
Digital Realty + future tenant after utility/power certaintyMaintain a monitoring position. Do not spend full pursuit resources on rack-level liquid cooling until power delivery and anchor-tenant fit-out provide a clear trigger.
Vantage Lighthouse
Vantage Lighthouse Campus — Stargate / Oracle / OpenAI
Immediate High-Fit / Pursue Now
A 902 MW four-building AI campus with confirmed mixed air/liquid cooling and 2026–2027 design/procurement activity provides an active multi-building specification opportunity.
Facility Loop
Rack / CDU / OEM
Vantage engineering + construction/cooling partners + OEM ecosystemPursue active specification and treat Lighthouse together with Frontier as a potential Vantage platform-level opportunity rather than as an isolated project.
Meta Hyperion
Meta Hyperion / Richland Parish Data Center Campus
Immediate High-Fit / Multi-Wave Strategic Pursuit
The expanded 5 GW program is a multi-year construction and compute deployment opportunity with high-density liquid-cooled rack architecture and ongoing design/procurement waves.
Rack / CDU / OEM
Facility Heat Rejection
Backup-Power Infrastructure
Meta data-center/cooling engineering + OCP/OEM technical qualification + DPR/Turner/Mortenson packagesTreat Hyperion as a multi-wave program rather than one procurement event. Pursue Meta technical/OCP/OEM integration in parallel with GC/package-level specification.
Project Profile — Source Evidence
Source fields shown exactly as supplied · 7 enriched technical facilities
FacilityCityStateCountryOwner / OperatorOwner TypeConstruction StatusFacility / Campus Phase (MW)Planned IT Load (MW)Capex Estimate ($Billion)Facility Area (Sq. Ft.)Estimated Go-LiveGo Live Date — Facility / Phase Specific (Additional Comment)Commercial Horizon / Next-12-Month Opportunity
Vantage Data Centers — Frontier AI Mega-CampusShackelford CountyTexasUnited StatesVantage Data CentersHyperscaleUnder constructionFull master plan: 14001400253700000Q4 2026Registered building completion dates currently span 15 Feb 2027–18 Apr 2028; treat delivery and filing dates as different schedule bases.YES
Applied Digital — Polaris Forge 2 AI CampusCass CountyNorth DakotaUnited StatesApplied Digital CorporationHyperscaleUnder constructionPhase 1: 200; Phase 2: 30050031,800,000 (for Current Phase)Q4 2026Full initial 200MW: early 2027. ABB indicates the two 150MW buildings are scheduled for 2026 and 2027.YES
DataBank — Red Oak Campus (DFW9–DFW12 Phase 1)Ellis CountyTexasUnited StatesDataBankColocationUnder constructionPhase 1: 240; Phase 2: 2404802.651600000Q2 2026Permit-based tenant-fit-out completions: DFW9 31 Dec 2026; DFW10 31 Jan 2027; DFW11 1 Mar 2027; DFW12 30 Oct 2027.YES
Microsoft Fairwater AI Datacenter Campus — Mount PleasantMount Pleasant, Racine CountyWisconsinUnited StatesMicrosoftHyperscaleOperational: Phase 1; Under construction: Phase 2; Announced/Planned: Phase 3Not availableNot available4.71.2M sq ft across three Fairwater 1 buildings on 315 acresQ1 2026Phase 2: scheduled for early 2028. Phase 3: no public completion date.YES: For Phase 2/Phase 3 design and procurement; NO: For Fairwater 1 core build, which is operational
Digital Realty — Silicon Valley SJC37Santa ClaraCaliforniaUnited StatesDigital Realty Trust, Inc.ColocationAnnounced/PlannedFull master plan: 48480.64435050Q4 2028Full energization is dependent on utility upgradesNO
Vantage Lighthouse Campus — Stargate / Oracle / OpenAIPort WashingtonWisconsinUnited StatesVantage Data CentersHyperscaleUnder constructionFull master plan: 902902152,500,000 across four data centersQ3 2028Full campus scheduled for completion in 2028; building-level ready-for-service dates are not publicly disclosedYES
Meta Hyperion / Richland Parish Data Center CampusRichland ParishLouisianaUnited StatesMeta Platforms, Inc.HyperscaleUnder constructionPhase 1: 2000; Phase 2: 3000500050Nearly 10,000,000 expanded campus; original announced scope was 4,000,000Q2 2028Full 5GW buildout completion date is not publicly disclosed. Earlier Louisiana project material listed 2030 for the original scope.YES: For expansion design, power, cooling and procurement activity; NO: For operational go-live, which begins in 2028